Restoring a failing heavy vehicle workshop without full reconstruction

Following a detailed assessment of the damaged workshop slab, Rombus implemented its modular concrete overlay system to strengthen the existing pavement rather than replace it.
This engineered solution preserved the existing infrastructure while delivering a resilient, long-lasting surface with significantly lower environmental impact and reduced downtime compared to conventional reconstruction methods.
This engineered solution preserved the existing infrastructure while delivering a resilient, long-lasting surface with significantly lower environmental impact and reduced downtime compared to conventional reconstruction methods.




